WATER SYSTEM
IMPROVEMENTS PROJECT
The District has contracted
the Engineering firm of
Cerrone
Associates, located
in Wheeling, WV to design some well needed
upgrades to our water system
Contract # 1 :
Stonegate Construction Inc., Belpre Ohio
- Install
approximately 9,000 Feet (LF) of 12" and 8" PVC and
Ductile water transmission mains at Murphytown and
Davisville.
- Replace
a water booster pump station in Murphytown.
Contract # 2 :
Mid Atlantic Storage Systems, Inc., Washington
Courthouse, Ohio
- Build a
380,000 gallon water storage tank at Loomis Ridge Road.
Contract # 3 :
Dreier & Maller, Inc., Parkersburg, WV
- Supply a
system wide automated water meter reading system
consisting of 3,500 radio read meters and drive by
reading equipment including software.
Contract # 4 :
Stonegate
Construction Inc., Belpre Ohio
-
Construct a new District Office / Maintenance facility
at Davisville, WV.
|
|
RED HILL SEWAGE PROJECT
The District has contracted
the Engineering firm of
Cerrone
Associates, located
in Wheeling, WV to design a Sewage
collection extension project, for the Red Hill, Dutch
Ridge and Mill Run Road areas of our District. .
The new collection system
will consist of gravity
flow and pressure main's, Grinder pump's will be utilized where gravity
flow is not
applicable.
There will be approximately
340 potential customers to be
supplied with sewer service in this project area.
Click
Here
for Bid
Information
Contract # 1 :
FAMCO Inc., St. Albans, WV
Wastewater
Treatment Plant upgrade
Contract # 2 :
Stonegate
Construction Inc., Belpre Ohio
Construct a
wastewater collection system extension for the Red Hill /
Dutch Ridge areas of Wood County.
|
RISER
RIDGE LAUREL FORK WATER LINE EXTENSION
The District has contracted
the Engineering firm of
Cerrone
Associates, located in Wheeling, WV to design a
water line extension project.
The project
serves
Riser Ridge, Volcano, Borland
Springs, Jerico Road, Doyle Dry Run Road, Oak Grove Road, Ewing Ridge,
Shiloh-Tallyho, Laurel Fork.
The project
will consist of, twenty seven miles of water line and serves an
estimated 300 new customers,
at an estimated cost of $3,650,000.
The project
is currently in the early design stage.
Updates will be posted to this web page as
they become available.
|
| |
|